首 页 - ┆ 小小说社会科学搜榜改进建议哲学宗教政治法律文化科教语言文字医学管理资源艺术资料数理化天文地球专业技术教育资源建筑房地产
当前位置:e书联盟 > 专业技术 > 机械化工 > 机械化工word
低电压穿越.doc
运行环境:Win9X/Win2000/WinXP/Win2003/
技术语言:简体中文
技术类型:国产软件 - 机械化工 - 机械化工word
授权方式:共享版
技术大小:70.0 KB
推荐星级:
更新时间:2019-12-30 17:21:57
联系方式:暂无联系方式
官方主页:Home Page
解压密码:点击这里
  • 好的评价 此技术真真棒!就请您
      0%(0)
  • 差的评价 此技术真差劲!就请您
      0%(0)

低电压穿越.doc介绍

3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code?
?2001年之前:
德国电网上的风电机组在电网故障时都会切除。
?2001年:
简单的Fault ride through的要求,实现故障后有功支持。
AGO 1 (Advanced Grid Option 1)
Vestas解决方案:在定子回路接入电阻,150~200ms,无功功率不控制
?Before 2001, wind turbine may trip during grid disturbances.
?At 2001:
Simple Fault ride through for post-fault active power output.
AGO 1 (Advanced Grid Option 1)
3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code??
?2003年之后:
E.on提出更高要求,Voltage tolerance curve 要求无功电流贡献以控制电压。
AGO 2 (Advanced Grid Option 2)
风电场本身有无功支撑能力,利于恢复,能够支撑电压。
?After 2003??
More requirements were asked by E.on. Reactive current is required to contribute for voltage control??
AGO 2??
Wind farm reactive power capability is required to suppurt the voltage restore.
3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code
德国LVRT能力规定(高短路电流)
LVRT requirement for High short-circuit current
3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code
德国LVRT能力规定(低短路电流)
LVRT requirement for low short-circuit current
3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code
?有功输出在故障切除后立即恢复并且每秒钟至少增加额定功率的20%。阴影区域中,有功功率每秒钟可以增加额定功率的5%。
???Active power output must resume immediately following fault clearing and be increased with a gradient of at least 20% of the rated power per second. Within the shaded area the active power increase can take place at 5% of the rated power per second.
3.3 德国低电压穿越要求 E.on requirement in Germany Grid Code
网络故障时,机组必须能够提供电压支持。如果电压降落幅度大于机端电压均方根值的10%,机组必须切换至支持电压。无功功率的提供必须保证电压每降落1%的同时无功电流增加2%
With a disturbed network the generating units must support the voltage. If a voltage drop of more than 10% of the root mean square (max.book118.com.) of the generator terminal voltage occurs the generation unit must be switched over to voltage support. 
The support of the network voltage must be provided within 20 ms after fault identification by providing reactive power at the generator terminals with a factor of 2% of the rated current per percent of the voltage drop. Switching back from voltage control to normal operation is possible after 3 seconds.

低电压穿越.doc

下载此电子书资料需要扣除0点,

电子书评论评论内容只代表网友观点,与本站立场无关!

   评论摘要(共 0 条,得分 0 分,平均 0 分) 查看完整评论

下载说明

* 即日起,本站所有电子书免费、无限量下载下载,去掉了每日50个下载的限制
* 本站尽量竭尽努力将电子书《低电压穿越.doc》提供的版本是完整的,全集下载
* 本站站内提供的所有电子书、E书均是由网上搜集,若侵犯了你的版权利益,敬请来信通知我们!

相关下载

Copyright © 2005-2020 www.book118.com. All Rights Reserved